Skip to content
  • Categories
  • Recent
  • Tags
  • Popular
  • Users
  • Groups
Skins
  • Light
  • Cerulean
  • Cosmo
  • Flatly
  • Journal
  • Litera
  • Lumen
  • Lux
  • Materia
  • Minty
  • Morph
  • Pulse
  • Sandstone
  • Simplex
  • Sketchy
  • Spacelab
  • United
  • Yeti
  • Zephyr
  • Dark
  • Cyborg
  • Darkly
  • Quartz
  • Slate
  • Solar
  • Superhero
  • Vapor

  • Default (No Skin)
  • No Skin
Collapse
Kamloops Cycling Coalition Logo

The KCC Forums

  1. Home
  2. KCC Members General Discussion
  3. Prioritized street sweeping bike lanes

Prioritized street sweeping bike lanes

Scheduled Pinned Locked Moved KCC Members General Discussion
18 Posts 5 Posters 34 Views 5 Watching
  • Oldest to Newest
  • Newest to Oldest
  • Most Votes
Reply
  • Reply as topic
Log in to reply
This topic has been deleted. Only users with topic management privileges can see it.
  • T Offline
    T Offline
    trentsmith
    wrote on last edited by
    #7

    I rode the Springhill route this week, and it was swept. Downtown is ok, but I have not yet been elsewhere.

    1 Reply Last reply
    0
    • R Offline
      R Offline
      RobHiggins
      wrote on last edited by
      #8

      Yesterday morning (Wednesday 26 March) I road down Summit (Hwy 5a to Notre Dame) and the bike lanes were still filled with debris. When I went home in the afternoon, they had done a first sweep. Adam had asked via the City 'Report an Issue' recently and I did the same on Sunday (or Monday, I forget).

      1 Reply Last reply
      0
      • Adam CA Offline
        Adam CA Offline
        Adam C
        wrote on last edited by
        #9

        Yesterday on my way home they'd swept up Summit as far as Gleneagles. This morning on my way down Hugh Allan was not done yet, but as soon as I crossed the highway I noticed Summit probably was done and then it became clear fairly soon they had indeed done a run up and down Summit.

        So I guess March 26th for them to complete an initial pass up Summit. Curious to see what's next.

        I did report an issue again yesterday early as they still hadn't done anything yet... I don't know that the reports have done much as they seem to be on a plan.

        1 Reply Last reply
        0
        • R Offline
          R Offline
          RobHiggins
          wrote on last edited by
          #10

          I've had good luck with 'Report an Issue.' Usually some action within two days but perhaps this time was just a coincidence. I did note that some irregular deep piles of sand/gravel were not just annoying but dangerous. That often gets more attention ... and was true.

          1 Reply Last reply
          0
          • R Offline
            R Offline
            RobHiggins
            wrote on last edited by
            #11

            Looks like a very rough first pass on Hugh Allan at least from Sifton to Hwy 5a.

            1 Reply Last reply
            1
            • Adam CA Offline
              Adam CA Offline
              Adam C
              wrote on last edited by
              #12

              Very rough, indeed! Almost looked like the machine got full right after starting that bit. Something's happening, though.

              1 Reply Last reply
              0
              • R Offline
                R Offline
                RobHiggins
                wrote on last edited by
                #13

                Yeah, they are running through Aberdeen today. It was pretty weird on Hugh Allan, as you note it was as if they hit capacity as soon as they started and just rearranged the debris.

                1 Reply Last reply
                1
                • Adam CA Adam C

                  Hmm, I wish I'd made note of the dates last year they had the initial bike lane sweep done on Summit & Hugh Allan - I do recall being impressed by it as I recall many of us were. It seemed like the bike lanes got an actual priority and were made safer pretty early.

                  I have been up and down Summit a few times lately and while I've seen sweepers in a variety of places (even caught a couple fueling up by the highway near Pineview this morning), Summit and Hugh Allan have some areas that really aren't great.

                  @RobHiggins - Am I off in my recollection that last year they'd done the bike lane routes up the hills impressively early last year?

                  N Offline
                  N Offline
                  Neil V
                  wrote on last edited by
                  #14

                  @adam I remember the same thing of last year.

                  1 Reply Last reply
                  1
                  • T Offline
                    T Offline
                    trentsmith
                    wrote on last edited by
                    #15

                    They were up near the Pineview parking area on High Allen last night. So clearly they are prioritizing cycle lanes. Too bad Bylaws wasn't with them to ticket all the vehicles parked in the cycle lane...

                    1 Reply Last reply
                    0
                    • R Offline
                      R Offline
                      RobHiggins
                      wrote on last edited by
                      #16

                      They have done my home street as well in Aberdeen. I'm not sure if they have purchased more sweepers but it seems they are getting it done faster overall. A couple years ago it seemed to be weeks after they started on the N Shore before they got to Aberdeen.

                      1 Reply Last reply
                      0
                      • Adam CA Offline
                        Adam CA Offline
                        Adam C
                        wrote on last edited by
                        #17

                        https://experience.arcgis.com/experience/830da2c720fb47ca9ffa059a6966b122 I get the same feeling as well, @RobHiggins - I suspect the perception changes pretty quickly too when it looks like they've changed their plan to not have to completely do one low-level area before starting any road further up. Their progress map is fairly interesting at the moment to see what's de-prioritized.

                        1 Reply Last reply
                        0
                        • R Offline
                          R Offline
                          RobHiggins
                          wrote on last edited by
                          #18

                          As of Thursday night it looks like they are around 90% done. Interesting that Pacific Way hasn't been done yet, just because it gets SOOO MUCH sand and gravel over the winter. Not a bike route of any value though.

                          1 Reply Last reply
                          1
                          Reply
                          • Reply as topic
                          Log in to reply
                          • Oldest to Newest
                          • Newest to Oldest
                          • Most Votes


                          • Login

                          • Don't have an account? Register

                          • Login or register to search.
                          KCC Main Website
                          • First post
                            Last post
                          0
                          • Categories
                          • Recent
                          • Tags
                          • Popular
                          • Users
                          • Groups